Description:
GMP standard Capsules filling machine semi automatic medicine pills making equipment hard soft empty capsule filler
Model GP-CF03
Maximum capacity 25000 capsules/hour
Capsule size 00#, 0#, 1#, 2#, 3 #, 4 #, 5#
Air pressure 0.4 – 0.6 MPa
Air supply ≥ 0.1 m3/min
Power 2.12 KW
Power supply AC,380V/50HZ 3 phase or customization
Net weight 330 kg
Overall size 1450 x 750 x 1650 mm
Gross weight 400 kg
Packing size 1800 x 800 x 1750 mm
Capsule size 00#, 0#, 1#, 2#, 3 #, 4 #, 5#
Air pressure 0.4 – 0.6 MPa
Air supply ≥ 0.1 m3/min
Power 2.12 KW
Power supply AC,380V/50HZ 3 phase or customization
Net weight 330 kg
Overall size 1450 x 750 x 1650 mm
Gross weight 400 kg
Packing size 1800 x 800 x 1750 mm
GP series semi-automatic capsule filling machine for small and medium sized pharmaceutical companies, health care products factory, hospital preparation room carefully crafted a set of electricity, gas as one of the new semi-automatic capsule filling machine, novel structure, attractive appearance, body and work tops, stainless steel, the product meets the GMP requirements; machine with programmed control system, touch panel operation (V-type), frequency conversion stepless adjustment of the joint control of pneumatic and electronic automatic counting device can automatically complete the capsule of the U-turn on spaces, separation (cap body torn off), drug filling, locking etc, and filling dose accuracy, easy to operate. Apply powder, granular medicines and health products in capsule filling! Is the ideal semi-automatic capsule filling machine.
Features on capsule filling machine semi automatic model GP-CP03
Main technical parameters of semi automatic capsule filling machine:
Ancillary equipment:
a vacuum pump, air compressor (user-owned)
Capsule inlustration:
Spare parts for semi automatic pharmaceutical making equipment:
GP-CF03 Configuration
| ||||
Name
|
Model
|
Brand
|
Quantity
|
Remark
|
Single-chip vacuum pump
|
XDSERIES
|
Shanghai
|
1
| |
Three-phase asynchronous motor
|
Y263M2-4
|
Shanghai
|
2
| |
Three-phase vertical gear down motor
|
TJH400W-7.5:1
|
Jiangmen Taijie
|
1
|
Silent
|
transducer
|
DVM-2S004G-02
|
Zhejiang
|
3
| |
worm and gear down motor(double extension worm)
|
WPWD-40-15:1
|
Hangzhou Xuya
|
1
| |
worm and gear down motor
|
WPWD-40-40:1
|
Hangzhou Xuya
|
1
| |
Transformer
|
JBK3-63
|
Zhejiang
|
1
| |
auxiliary relay
|
JTX-2C
|
Zhengtai
|
2
| |
AC relay
|
CJX2-12
|
Huanyu
|
2
| |
breaker
|
DZ47-63 D20
|
Zhejiang
|
1
| |
breaker
|
DZ47-63 C6
|
Zhejiang
|
1
| |
Urgent stop switch
|
Y090-11X
|
Huanyu
|
1
| |
Control panel
|
PC
|
Made by ourselves
|
1
| |
SUS
|
304
|
Puxiang
|
Capsule samples:
Capsule filling machine semi automatic model GP-CF03 in stock:
Guarantee: for all the machine, it claims three years for guarantee.(Excluded from the warranty are problems due to accidents, misuse , misapplication, storage damage, negligence, or modification to the Equipment or its components. ALSO THE EASY BROKEN SPARE PART IS NOT INCLUDED IN THE GUARANTEE)
Installation: after the machine arrive your factory,if you need,our technician will go to your place to install and test the machine and also training your worker to operating the machine (The time of train depend on you worker). The expenses (air ticket ,food , hotel,the travelling fee on your country) should be borne by the buyer and you need paid for the technician USD50 per day. also you can go to our factory to do training.
After-sale service: If you get the problem on the machine ,our technician will go to your place to fixed the machine as soon as possible. The cost should be borne by the buyer;
Installation: after the machine arrive your factory,if you need,our technician will go to your place to install and test the machine and also training your worker to operating the machine (The time of train depend on you worker). The expenses (air ticket ,food , hotel,the travelling fee on your country) should be borne by the buyer and you need paid for the technician USD50 per day. also you can go to our factory to do training.
After-sale service: If you get the problem on the machine ,our technician will go to your place to fixed the machine as soon as possible. The cost should be borne by the buyer;
No comments:
Post a Comment