Description:
Liquid chocolate honey sauce mixing heating filling three lanes sachet packing machine high speed 3 tracks VFFS bagging system solution
Model:GP-IP03 three lanes packing machine
power supply single-phase 220V/50Hz
total power 3.5KW
packing material OPP/CPP、CPP/PE MST/PE、PET/PE
power of horizontal sealing heating sheet (4-sheet in series) 800W/220VAC
thickness of packing film 0.05-0.08mm
power of vertical sealing heating sheet (2-sheet in series) 500W/220VAC
maximum width of packing film 1000mm
measuring range 1-40mL(2-20g)
220mm (width)x300mm (length)
air pressure used 6.5MPa
packing speed 5-60 packages/minute
air consumption 600L/min
weight of complete machine 720kg
overall dimension 1850(length) X123(width) X 2320(height)
power supply single-phase 220V/50Hz
total power 3.5KW
packing material OPP/CPP、CPP/PE MST/PE、PET/PE
power of horizontal sealing heating sheet (4-sheet in series) 800W/220VAC
thickness of packing film 0.05-0.08mm
power of vertical sealing heating sheet (2-sheet in series) 500W/220VAC
maximum width of packing film 1000mm
measuring range 1-40mL(2-20g)
220mm (width)x300mm (length)
air pressure used 6.5MPa
packing speed 5-60 packages/minute
air consumption 600L/min
weight of complete machine 720kg
overall dimension 1850(length) X123(width) X 2320(height)
GP-IP03 multilanes packing machine VFFS packaging bagging solution is a full automatic packing machine with high quality and high performance made by this co.,ltd through introducing, digesting and absorbing advanced technology from abroad, and has a series of automatic functions, such as automatic-delivering, measuring, bag-making, sealing, date printing, finished product exporting.
Bag sealing types:
This machine adopts high precision servo film-transferring system, PLC program control, advanced touch-type human machine interface, photoelectric automatic positioning tracing and digital type temperature control, which make operation of the complete machine simpler, perfect, and it is the first-choice equipment for improving producing efficiency, decreasing labor intensity, upgrading packing level in food packing industry.
Performance and Specifications of multilanes packing machine VFFS bagging system:
Notice: Packing speed according to packing material and packing weight .packing materials should be used in rolls, the outer diameter should be ≤400mm, inner diameter of framework should be Φ75mm, thickness of compound packing material should be 0.05-0.08mm, surface of the packing material should be smooth without wave, in the range of 10mm on the side should not have printed pattern and characters (namely the grounding should be pure), contrast between color dot and grounding should be obvious.
2.A►Arrangement plan of the complete machine
3. Installation notice
1). Packing machine and finished product transferring machine should be connected with 220VAC power supply with earth leakage protection and a current of more than 10A
2). Automatic lifting machine should be connected with 3-phase 380VAC power supply with earth leakage protection and open-phase protection and a current of more than 10A.
3). Please don’t forget to install earth wire.
4). Connect the air source with entrance of triplet of packing machine.
5). Use elevator to transfer material into big material hopper at the top of packing machine.
6). Install date printing ink ribbon
7). Install packing film.
4)After lead the packing film enter bag former, adjust swing lever to make packing film pass through feeding tube. At this time, film-delivering switch and film motor at the bottom of packing machine enter automatic work status.
►Debugging of human machine interface
Touch screen language English-French Bilingual version
turn on ,display will show main menu,press English ,enter into second step :
1)Use hand touch parameter setting,Screen display as show
2)Touch next page,screen display as shown
Cutter delay xxx stands for the time period after film conveyance and before electromagnetic valve gaining electricity (unit: second), the set number takes that after film conveyance and before electromagnetic valve gaining electricity as standard
Cutter xxx stands for the time of cutter electromagnetic valve gaining electricity (unit: second), the set number takes that cutter cutting packing film, but not impacting drop of next bag as standard
Film sealing xxx stands for the time of horizontal sealing electromagnetic valve gaining electricity (unit: second), depending on thickness of packing film and packing speed, and taking that packing film sealing is well done and leakage-free as standard
Vertical sealing xxx stands for the time of horizontal sealing electromagnetic valve gaining electricity (unit: second), depending on thickness of packing film and packing speed, and taking that packing film sealing is well done and leakage-free as standard
Bag length xxx stands for the length packing film can run without color code magic eye (unit: mm), length setting should be central distance between the two color codes plus 10mm.
(Due to film drawing belt sliding and other reasons, it is possible that the actual packed length is different from set value, in this case, it is necessary to increase set bag length to make correction.)
◆Printing date action xxx stands for the time of printing date electromagnetic valve gaining electricity.
◆Printing date delay xxx stands for the time period after film conveyance and before air inflate.
◆Horizontal delay xxx stands for the time period after film conveyance and before horizontal sealing .
◆Vertical delay xxx stands for the time period after film conveyance and before vertical sealing.
3)If it is required to set parameters of various functions, touch thefunction, it will display at the left end of the screen(as shown in the chart).
At this time, parameter can be amended, after the amendment, press thekey of return to confirm.
For example: amend horizontal sealing electric parameter: (change the original 0.65 into 0.75)
Touch the parameter of 0.65 of horizontal sealing, and it will twinkle, at the same time the screen displays digital table of the above chart, touch 0.75 of the digital table, then press the key of return.
4).Return homepage,touch the key of “Manual”,screen display
◆Touch pull filming ,pull filming once.
◆Touch make one bag stands,make one bag once
◆Touch horizontal sealing open, horizontal sealing jaw open.
◆Touch vertical sealing open,vertical sealing jaw open.
◆Touch cutter return: cutter action open.
5)turn to homepage, touch “auto”, screen displays
◆On: touch the key of “on”, packing machine will start.
◆Off: touch the key of “off”, packing machine will stop.
◆touch Alarm, display show
◆On:touch the key of “on”, open the alarm
◆Off:touch the key of “off”, turn off the alarm
Note: Establishment of parameters of packing machine is directly related with actual packing speed reached by packing machine. The bigger the value of various parameters, the lower the packing machine can reach, on the contrary, the quicker.
►Common faults, reasons and elimination
Operation methods
1) Open the total power of the machine, then preheat the vertical and horizontal sealing jaw date printer to the temperature setting and the horizontal sealing jaw which parts should be add some adequate lubricating oil.
2)Please pay attention to check the cleanliness of the tooth surface of vertical and horizontal sealing jaw.
3)Please check the equipment of the code date, packing film right or wrong, and check the Electronic location.
4)Open the switch of the printer of the date, and send the packaging film to the intended location. Open the motor, make 4-5 empty bags and then stop it. Check the bags is qualified, if done then open the materials falling switch to work.
5)First to shut down the materials falling switch when it needs to cut off the power,and then related the electrical power supply ,so as not to damage folders, tool damage.
Equipment maintenance
1)Before on or off duty, it is necessary to clean interior and exterior of the machine, thoroughly sterilize the parts passed by food
2)Before on or off duty every day, please check if 1/3 of the oil table of air source air source triplet oil storage jar is maintained, is less, it is necessary to pour 20# pure and clean oil until about 1/2 of the jar body.
3)Before start every day, pour 20# machine oil into oil cup on the horizontal sealing support until it becomes full.
4)Before off duty, it is necessary to take off unused packing film so as to prevent from bending supporting tube.
5)During the process of start, if material is clamped in vertical sealing or horizontal sealing, it is necessary to stop the machine immediately and clean tooth surface of vertical sealing or horizontal sealing with brass wire brush.
►Pneumatic schematic diagram 1
L-----相线 L-----phase wire
N-----零线 N-----zero wire
QS-----总开关 QS-----main switch
QFO-----空气开关 QFO-----air switch
QF1-----断路器 QF1-----breaker
QF2-----断路器 QF2-----breaker
QF3-----断路器 QF3-----breaker
220VAC/24VDC-----开关电源 220VAC/24VDC-----on-off power source
SGDL-02AR-----伺服控制器 SGDL-02AR-----servo controller
BFV7002FBR-----变频器 BFV7002FBR-----transducer
GK1-----固态继电器 GK1-----solid-state relay
GK2-----固态继电器 GK2-----solid-state relay
GK3-----固态继电器 GK3-----ical sealing and horizontal sealing temperature control switch
B1-----打印发热元件 B1----- print heating element
R1-----横封发热元件200W/50VAC R1-----200W/50VAC horizontal sealing heating element
R2-----横封发热元件200W/50VAC R2-----200Wsolid-state relay
JK3-----放纸光电开关 JK3-----paper-placing photoelectric switch
K-----纵封横封温控开关 K----vert/50VAC horizontal sealing heating element
R3-----横封发热元件200W/50VAC R3----- 200W/50VAC horizontal sealing heating element
R4-----横封发热元件200W/50VAC R4-----200W/50VAC horizontal sealing heating element
R5-----横封发热元件160W/50VAC R5-----160W/50VAC horizontal sealing heating element
R6-----横封发热元件530W/170VAC R6-----530W/170VAC horizontal sealing heating element
J5-----继电器触点 J5-----relay contact
M1-----主电机 M1-----main motor
M2-----运膜电机 M2-----film conveyance motor
M3-----毛刷电机 M3-----brush motor
M4-----放膜电机 M4-----film placing motor
C1-----电容 C1-----capacitance
C2-----电容 C2-----capacitance
BT1-----横封温度控制器 BT1-----horizontal sealing temperature controller
BT2-----纵封温度控制器 BT2-----vertical sealing temperature controller
BT3-----打印温度控制器 BT3-----print temperature controller
i.插座 socket
i.测试盘 test table
►Pneumatic schematic diagram 2
l PLG接线端子示意图 sketch map of PLG junction terminal
l X0—光电盘传感输入 X0—photoelectric table transducer input
l X1—色标传感器输入 X1—color code transducer input
l X2—停止 X2—stop
l X3—低温报警输入 X3—low temperature alarm input
l X4—碳带传感报警输入 X4-----carbon belt transducer alarm input
l X5—包装膜传感报警输入 X5-----packing film transducer alarm input
l X6—物料传感器报警输入 X6------material transducer alarm input
l X7—切刀传感器输入 X7------cutter transducer input
l YO—伺服电机2脚输出 YO------servo motor 2-foot output
l Y1—充气输出 Y1------inflation output
l Y2—纵封输出 Y2------vertical sealing output
l Y3—横封输出 Y3------horizontal sealing output
l Y5—变频器输出 Y5------transducer output
l Y6—切刀输出 Y6------cutter output
l Y7—连包输出 Y7------package output
l JK1—光电盘传感器 JK1------photoelectric table transducer
l JK2—色标传感器 JK2------color code transducer
l JK4—切刀传感器 JK4------cutter transducer
l JK5—碳带传感器 JK5------carbon belt transducer
l K2—运膜气缸微动开关 K2------film conveyance cylinder jogging switch
l SB—急停开关 SB------emergency stop switch
l B1—切刀电磁阀 B1------cutter electromagnetic valve
l B2—纵封电磁阀 B2------vertical sealing electromagnetic valve
l B3—横封电磁阀 B3------horizontal sealing electromagnetic valve
l B4—运膜电磁阀 B4------film conveyance electromagnetic valve
l B5—充气电磁阀 B5------inflation electromagnetic valve
l J2—继电器 J2------relay
l J3—继电器 J3------relay
l J4—继电器 J4------relay
l J5—继电器 J5------relay
l J6—继电器 J6------relay
l J7—继电器 J7------relay
l 有连袋装置时安装J7 installation in case of package bag device J7
l 绿 green
l 白 white
l 橙 orange
l 黑 black
►CH-DL-3 air passage diagram
● 1.气源 air source
l 2.气源三联体 air source triplet
l 3.二位五通电磁阀 2-position 5-way electromagnetic valve
l 4.横封气缸 horizontal sealing cylinder
l 5.日期打印气缸 date printing cylinder
l 6.纵封气缸 vertical sealing cylinder
l 7.切断刀气缸 cutter cylinder
l 8.运膜气缸 film conveyance cylinder
l 9.减压阀 pressure reducing valve
l 10.充气 inflation
►Listing of easily damaged parts
◆Off: touch the key of “off”, packing machine will stop.
◆touch Alarm, display show
◆On:touch the key of “on”, open the alarm
◆Off:touch the key of “off”, turn off the alarm
Note: Establishment of parameters of packing machine is directly related with actual packing speed reached by packing machine. The bigger the value of various parameters, the lower the packing machine can reach, on the contrary, the quicker.
►Common faults, reasons and elimination
Operation methods
1) Open the total power of the machine, then preheat the vertical and horizontal sealing jaw date printer to the temperature setting and the horizontal sealing jaw which parts should be add some adequate lubricating oil.
2)Please pay attention to check the cleanliness of the tooth surface of vertical and horizontal sealing jaw.
3)Please check the equipment of the code date, packing film right or wrong, and check the Electronic location.
4)Open the switch of the printer of the date, and send the packaging film to the intended location. Open the motor, make 4-5 empty bags and then stop it. Check the bags is qualified, if done then open the materials falling switch to work.
5)First to shut down the materials falling switch when it needs to cut off the power,and then related the electrical power supply ,so as not to damage folders, tool damage.
Equipment maintenance
1)Before on or off duty, it is necessary to clean interior and exterior of the machine, thoroughly sterilize the parts passed by food
2)Before on or off duty every day, please check if 1/3 of the oil table of air source air source triplet oil storage jar is maintained, is less, it is necessary to pour 20# pure and clean oil until about 1/2 of the jar body.
3)Before start every day, pour 20# machine oil into oil cup on the horizontal sealing support until it becomes full.
4)Before off duty, it is necessary to take off unused packing film so as to prevent from bending supporting tube.
5)During the process of start, if material is clamped in vertical sealing or horizontal sealing, it is necessary to stop the machine immediately and clean tooth surface of vertical sealing or horizontal sealing with brass wire brush.
►Pneumatic schematic diagram 1
L-----相线 L-----phase wire
N-----零线 N-----zero wire
QS-----总开关 QS-----main switch
QFO-----空气开关 QFO-----air switch
QF1-----断路器 QF1-----breaker
QF2-----断路器 QF2-----breaker
QF3-----断路器 QF3-----breaker
220VAC/24VDC-----开关电源 220VAC/24VDC-----on-off power source
SGDL-02AR-----伺服控制器 SGDL-02AR-----servo controller
BFV7002FBR-----变频器 BFV7002FBR-----transducer
GK1-----固态继电器 GK1-----solid-state relay
GK2-----固态继电器 GK2-----solid-state relay
GK3-----固态继电器 GK3-----ical sealing and horizontal sealing temperature control switch
B1-----打印发热元件 B1----- print heating element
R1-----横封发热元件200W/50VAC R1-----200W/50VAC horizontal sealing heating element
R2-----横封发热元件200W/50VAC R2-----200Wsolid-state relay
JK3-----放纸光电开关 JK3-----paper-placing photoelectric switch
K-----纵封横封温控开关 K----vert/50VAC horizontal sealing heating element
R3-----横封发热元件200W/50VAC R3----- 200W/50VAC horizontal sealing heating element
R4-----横封发热元件200W/50VAC R4-----200W/50VAC horizontal sealing heating element
R5-----横封发热元件160W/50VAC R5-----160W/50VAC horizontal sealing heating element
R6-----横封发热元件530W/170VAC R6-----530W/170VAC horizontal sealing heating element
J5-----继电器触点 J5-----relay contact
M1-----主电机 M1-----main motor
M2-----运膜电机 M2-----film conveyance motor
M3-----毛刷电机 M3-----brush motor
M4-----放膜电机 M4-----film placing motor
C1-----电容 C1-----capacitance
C2-----电容 C2-----capacitance
BT1-----横封温度控制器 BT1-----horizontal sealing temperature controller
BT2-----纵封温度控制器 BT2-----vertical sealing temperature controller
BT3-----打印温度控制器 BT3-----print temperature controller
i.插座 socket
i.测试盘 test table
►Pneumatic schematic diagram 2
l PLG接线端子示意图 sketch map of PLG junction terminal
l X0—光电盘传感输入 X0—photoelectric table transducer input
l X1—色标传感器输入 X1—color code transducer input
l X2—停止 X2—stop
l X3—低温报警输入 X3—low temperature alarm input
l X4—碳带传感报警输入 X4-----carbon belt transducer alarm input
l X5—包装膜传感报警输入 X5-----packing film transducer alarm input
l X6—物料传感器报警输入 X6------material transducer alarm input
l X7—切刀传感器输入 X7------cutter transducer input
l YO—伺服电机2脚输出 YO------servo motor 2-foot output
l Y1—充气输出 Y1------inflation output
l Y2—纵封输出 Y2------vertical sealing output
l Y3—横封输出 Y3------horizontal sealing output
l Y5—变频器输出 Y5------transducer output
l Y6—切刀输出 Y6------cutter output
l Y7—连包输出 Y7------package output
l JK1—光电盘传感器 JK1------photoelectric table transducer
l JK2—色标传感器 JK2------color code transducer
l JK4—切刀传感器 JK4------cutter transducer
l JK5—碳带传感器 JK5------carbon belt transducer
l K2—运膜气缸微动开关 K2------film conveyance cylinder jogging switch
l SB—急停开关 SB------emergency stop switch
l B1—切刀电磁阀 B1------cutter electromagnetic valve
l B2—纵封电磁阀 B2------vertical sealing electromagnetic valve
l B3—横封电磁阀 B3------horizontal sealing electromagnetic valve
l B4—运膜电磁阀 B4------film conveyance electromagnetic valve
l B5—充气电磁阀 B5------inflation electromagnetic valve
l J2—继电器 J2------relay
l J3—继电器 J3------relay
l J4—继电器 J4------relay
l J5—继电器 J5------relay
l J6—继电器 J6------relay
l J7—继电器 J7------relay
l 有连袋装置时安装J7 installation in case of package bag device J7
l 绿 green
l 白 white
l 橙 orange
l 黑 black
►CH-DL-3 air passage diagram
● 1.气源 air source
l 2.气源三联体 air source triplet
l 3.二位五通电磁阀 2-position 5-way electromagnetic valve
l 4.横封气缸 horizontal sealing cylinder
l 5.日期打印气缸 date printing cylinder
l 6.纵封气缸 vertical sealing cylinder
l 7.切断刀气缸 cutter cylinder
l 8.运膜气缸 film conveyance cylinder
l 9.减压阀 pressure reducing valve
l 10.充气 inflation
►Listing of easily damaged parts
Cutter:We advise you to change it once every three months
►Spare parts list
horizontal sealing heater 4 set
vertical sealing heater 1set
interior hexagonal spanner 4-10mm 1 set
copper brush 120mm 1 piece
cutter 220mm 1set
oil kettle 150ml 1 piece
character grain 1 box
horizontal sealing heater 4 set
vertical sealing heater 1set
interior hexagonal spanner 4-10mm 1 set
copper brush 120mm 1 piece
cutter 220mm 1set
oil kettle 150ml 1 piece
character grain 1 box
http://gearpackaging.com/
Contact:Tony
Cellphone:+86-188-1682-5234
Telephone:+0769-8270-8461
Skype:Gearpacakaging Tony
E-mail:gearpacking@gmail.com