Automatic hardware bagging equipment screws bolts rivets counting packing machinery with hardware vibrating feeding tray bowls

Description:
Automatic hardware bagging equipment screws bolts rivets counting packing machinery with hardware vibrating feeding tray bowls 
Model:GP-HPM04
Bowl quantity: 4pcs 
Measuring range:It is determined based on the actual situation of the parts.
Length of the bag(mm):40-160
Width of the bag(mm):40-100
Measuring range:adjustable within a certain range
Manufacturing capacity(bag/minute):20-40
Sealing form:three-side sealing,four-side sealing or back-sealing
total power(W):1600 Gas consumption:20L/Min 0.75Ma
Machine size :1300*1100*1850mm
Weight:400KG
Packing material:composite membrane,foil and hot-sealed material and etc.
Net weight(Kg):according to the requirement of the project,the normal weight is changed somtimes.
Outer dimension(mm):according to the requirement of the project,the normal weight is changed somtimes.
Automatic hardware bagging equipment with 1bowl to 12bowls feeding screws
Basic parameter of model GP-HPM04 four bowls/vibrators packing machine:

Model GP-HPM04
Measuring range:It is determined based on the actual situation of the parts.
Length of the bag(mm):40-160
Width of the bag(mm):40-100
Measuring range:adjustable within a certain range
Manufacturing capacity(bag/minute):20-40
Sealing form:three-side sealing,four-side sealing or back-sealing
total power(W):1600   Gas consumption:20L/Min  0.75Ma
Machine size :1300*1100*1850mm
Weight:400KG
Packing material:composite membrane,foil and hot-sealed material and etc.
Net weight(Kg):according to the requirement of the project,the normal weight is changed somtimes.
Outer dimension(mm):according to the requirement of the project,the normal weight is changed somtimes.
Machines in different plates feeding vibrators according to special requirements and the feeding materials

Drawing based on 5  vibrators for screws feeding
►Note
1.Check box
Upon receipt of the controller, it is necessary to check the following:
☆  Attention
²  Model in line with the order Model  .
²  Parts of² the controller is complete, including screen and installation of a stent, a system host controller, a line of communication.
²  During transport, for damage.
 2.Transportation and installation
☆  Attention
²  Handling controller in order to avoid damage, please handle with care.
²  Controller handling when the lower part of boosting, or controllers have out on the floor may be damaged.
²  Not to damage the installation of the controller or the lack of security control, personal injury and the risk of damage to the machine.
²  Controller in the power cut off only after the installation.
 ►The use of the environment and requirements
Please ensure that the controller in the environment and working conditions:
Ø   Control the use of the environment relativeØ humidity <95%   (40 ℃ non-Gel).
Ø   The use of ambient temperature 0-45 ℃.
Ø   Altitude <1000M.
Ø   Control the use of AC-DC 24V ± 10% power.
Ø   DC transistor output 50V/50mA.
Ø   Switch input for volume 20mA
Ø   MTBF: ≥ 10,000 hours.
Ø   Anti: in line with the requirements of IEC-801
►Mechanical components

►Diagram of the System packaging:

The photo shows the block diagram of the system, control principles are as follows: stepper motor controller through a long bag control, motor control, through the General Seal. Long-bag will be a long drawn by the operator to control the use of color by color control of a long bag. And as a display monitor set up with the man-machine interface, allowing the system to use and easy to operate.
►General Function from hardware packing machine

1) installation
Power must be connected to the former location of the machine to confirm, correct installation of electrical connections. 
Eye color, external sensors installed in the correct position.
2) operation
After the start signal input, packaging and packaging machines into the operation of the state. 
When the signal to stop the importation, packaging machine to stop immediately, stop at a display screen, according to the rest of the keys do not respond. 
Location of the stop signal input, the cutter axis to the open position after the stop. 
Fixed-point gap bag input signal, the packaging machine at a pull bag, pull bag up to move the signal cancellation. 
Seal-point move signal input, in Seal packaging machine, moving at up to Seal signal cancellation.
3) Do not control the color logo
When the standard color film, color logo will be set to control the other so that the state can, through the identification of other color sensors on the bit. However, if the color in the logo is no other effective range of color enter the command will be a warning. At this point, in color expanding the scope of effective identification of other films again after the installation.
►The adjustment commissioning testing of packing machine process

1.Initial operation
(1) To confirm the correct connection 
(2) To set the length of the packaging. 
(3) The use of fixed-length package. 
(4) To start, this time to observe whether the length of the  packaging and set up, or check the installation of mechanical    and electrical connections are correct.
(5) Adjust the speed, the speed is observe abnormal. 
(6) By positioning stop to observe whether or not to stop at  the specified location, or adjust the location of the stop. 
(7) Be changed to electric eye packaging. To observe whether  or not to cut to the location of the color can be adjusted through the location of the cutter, cut it in color 
S-on. On the test run into the following points:
Ø  Confirm connection
Ø  To confirm whether or not the work of a variety of sensors.
Ø  Confirm and monitor the communications between the controller.
Ø  Input parameters.
Ø  Constant confirmation machinery.
Ø  To confirm whether there has been a warning / error, and so on.
Ø  Set the length of the packaging.
Ø  Start the equipment.
Ø  If the normal operation, you do not need to carry out a variety of adjustments.
Ø  Parameters of the data records and keeping the good.
►Basic information on packing machine screw packaging system

1. The full automatic screw packing machine use the mitsubishi PLC as the center controller , it has fast reaction speed , enriched function and accurate positional control ect. functions . And also has much stronger interference power and longer using date ect functions . The operation screen adopt high-definition LCD screen , which makes the interface humane .
2.  The whole electricity devices controlled by PLC system , it has the features of operation simply , which makes operate mistake , the conveyor is consist of single power and advanced clutch motor , and dispatch the control single , filling by PLC , makes it pointing and filling accurately .
3.  It process of machine’s conveyor , filling , sealing , cutting the whole set are finished by cylinder , which is much safer the mechanical , and also can prevent the damage of molder and cutter .
4.  The machine can automatic finish the process of measuring , filling , feeding , sealing , bag making , easy tearing , cutting and accounting the whole .
5.  The packing speed can unless adjustable in the process , and makes the bag making , feeding , cutting and sealing matched , makes the whole process stable .
6.  The length of the bag is adjustable , which is stable working .
►Helpful information for solving some problems during running the machine

►The way to operate the screw packing machine
1.Normal operation


The screen shown in Figure transform as follows:
2. First finish set the vibrate plate , makes many kinds of screw can stable  vibrate in the plate , and can enter into the matched track smoothly . When the screw in the track of point , the plate will stop vibrating after receiving the pointing .
3. The vibrate plate shall be single of the material , or it will lead to the track and the vibrate plate works not smoothly .
4.  Put of the right cover of the conveyor line , and adjust he screw in the singer feeding rink , and point the put in point , then adjust the fixed, which makes the light on , and then fixed the screw .
5.  The vertical sealing molder shall be adjustable with the bag-making molder , first put the bag-making molder on the packing film shelf , makes the center line and the bag making molder pole and the pull bag wheel parallel .
6. Adjust the six many screws , combine the bag making molder parallel , makes the filling hopper and machine are parallel .
7. Adjust the sealing molder , first put the molder open , makes the molder keep  5 mm .
8. Fixing the screw , and then put off the bag making molder , and put together the sealing molder and the silicone .
9.  The bag making molder shall be adjusted many times , then if it makes the bags beautiful and get to the ideal state .
10.List of parameters

11.Set up parameters to run the process

►Troubleshooting and notice 
Throughout the operation, when the failure occurred when the display screen will be run by the failure to screen.
When the lack of paper, the screen shows the following chart:




When the subject of photo-color detection switch fails, the screen showed the following chart:
track error for packing equipment.jpg
► Troubleshooting
Throughout the operation, if unusual, please refer to the troubleshooting guide in the table below. If not, please contact the manufacturers:
♦Fault
Possible causes of failure
Solutions
Lack of paper
Add packaging film
Fault
Possible causes of failure
Solutions
Detection of the target color photo switch failure
Maintenance photoelectric switch, such as setting a long bag
If the cause of the malfunction has been ruled out, Press ESC The system will automatically resume running into the screen.
♦Frequently Asked Questions and answers
Q:LCD screens do not show the normal value in the lower right corner shows the "communication error."
A:That the main LCD screen and non-communication controller, LCD screen should check with the host controller to connect communication lines between the normal connections, if the communication lines should be dropped to re-connect, or contact with the manufacturers.
Q:LCD screens do not show why?
A:Check the LCD screen is connected to power lines, should be dropped if re-connect.
Q:Why not pull bags on the completion of the Seal of the phenomenon?
A:This is due to a long bag and Seal caused by the speed of that increase the speed bag and Latin America.
Q:If the particle is, do not want to appear powder screen, how to deal with?
A:Because the controller is a full-featured type can be set up in the factory, the ban on powder-screen appearance.
Q:If you would like to welcome screen is not set up their own company's logo only in general show the welcome screen?
A:There are two welcome screen display, 1 - Company, 2 - Welcome.According to the manufactuyeys may need to "factory settings screen," two of the screen.
Q:Would like to switch between Chinese and English display?
A:Support for the display screen in two languages, 1 - Chinese, 2 - English. Manufacturers can be "factory settings screen" set up to choose Chinese or English.
Q:How to set passwords do not have to be able to enter the "factory settings screen"?
A:Access to "modify the password screen", the password is set to   Password setting.jpgWill be able to enter the "factory settings" screen do not have a password.
4.    Day-to-day maintenance
Controllers do not have to carry out regular checks, but in order to be able to first place with the prevention, and to ensure reliable operation of equipment, it is necessary to conduct regular inspections are as follows:

Wooden case packing for sea shipping:

http://gearpackaging.com/